
Heavy Lifting Slings
Selantic Fibre AS has supplied High Performance Fibre slings to the heavy lift industry since 1993. The following projects are a selection from our customer database;
|
Customer / Project
|
Year |
Product |
|
KOS; Statoil TPRS |
1994 |
Lifting assembly 4 parts, MBL 252Te |
|
ABB Transformers |
1994 |
Lifting of Transformers, MBL 400Te |
|
HMV; Sleipner Vest SLB |
1995 |
Installation slings MBL 210Te |
|
Stolt Comex Seaway |
1995 |
Installation slings MBL 280Te |
|
KOS |
1995 |
Lifting Assemblies 3 & 4 parts |
|
Shell UK / Brent C |
1995 |
Oshore installation, MBL 350Te |
|
KOS |
1996 |
Lifting Assy. With spreaderbar |
|
Rockwater |
1996 |
Installation slings MBL 500Te |
|
Coflexip Stena Offshore |
1996 |
Installation slings |
|
Stolt Comex S. / Harald |
1996 |
Riser installation |
|
Kværner Energy / turbines |
1996 |
Lifting slings MBL 500Te |
|
Stolt / Seaway Condor |
1996 |
Installation slings MBL 324 and 280Te |
|
Water Weight |
1996 |
Lifting sling MBL 600Te |
|
Wood and Clark |
1996 |
MBL 800, 400Te |
|
ABB Kraft / Turbines |
1997 |
Hydroelectric Power Installation, MBL 400T |
|
Stolt Comex Seaway |
1997 |
Subsea installation slings, MBL 324Te |
|
Stolt Comex S. / Ekofisk |
1997 |
Installation Wye structure, MBL 375Te |
|
KOS |
1997 |
Installation Manifolds, MBL 390, 280, 210Te |
|
Stolt / Rockwater |
1997 |
Spool inst. Visund Tie-in, Norfra, N.Valhall |
|
Selmer |
1997 |
Concrete elements, MBL 450Te |
|
Ministry of Defence |
1997 |
Lifting neuclear submarine, MBL 600Te |
|
KOS |
1998 |
Installation of Manifolds, Hubs,, MBL 390Te |
|
Rockwater |
1998 |
Subsea installation, MBL 270Te |
|
Stolt / Maersk |
1998 |
Installation slings MBL 280Te |
|
ABB Nat.Transformers |
1998 |
Transformer lifting, MBL 400, 280Te |
|
Water Weight |
1998 |
Lifting sling MBL 930Te |
|
Rockwater |
1999 |
Installation sling, MBL 650Te |
|
NSB / New trains |
1999 |
Train lifting sling, MBL 160Te |
|
Rockwater/Åsgard bundle |
1999 |
Pull-in sling, MBL 1000 Te, WLL 253Te |
|
ABB Kraft |
1999 |
Lifting Turbines, MBL 385Te |
|
Stolt, Rockwater / Spools |
1999 |
Installation slings |
|
KOS / Terra Nova |
1999 |
Inst. Manifolds, Hubbs, MBL 390, 210Te |
|
Stolt Comex Seaway |
1999 |
Installation slings MBL 525, 475Te |
|
KOS / Manifolds, Hubbs,, |
2000 |
Installation, MBL 388, 276, 155Te |
|
Selmer / Concrete bridge |
2000 |
Uglen, MBL 450Te |
|
Stolt C.S. / Pig recovery |
2000 |
MBL 475, 270, 250Te |
|
SCS, Rockwater / Spool |
2000 |
Installation slings |
|
KOS / Girassol |
2000 |
Inst. Manifolds, Hubbs, MBL 390, 210Te |
|
Coflexip / Kyle Tie Inn |

