...

Heavy Lifting Slings

Selantic Fibre AS has supplied High Performance Fibre slings to the heavy lift industry since 1993. The following projects are a selection from our customer database;

 



Customer / Project

 

Year

Product

KOS;  Statoil TPRS

1994

Lifting assembly 4 parts, MBL 252Te

ABB Transformers

1994

Lifting of Transformers,  MBL 400Te

HMV; Sleipner Vest SLB

1995

Installation slings MBL 210Te

Stolt Comex Seaway

1995

Installation slings MBL 280Te

KOS

1995

Lifting Assemblies 3 & 4 parts

Shell UK / Brent C

1995

Oshore installation, MBL 350Te

KOS

1996

Lifting Assy. With spreaderbar

Rockwater

1996

Installation slings MBL 500Te

Coflexip Stena Offshore

1996

Installation slings

Stolt Comex S. /  Harald

1996

Riser installation

Kværner Energy / turbines

1996

Lifting slings MBL 500Te

Stolt / Seaway Condor

1996

Installation slings MBL 324 and 280Te

Water Weight

1996

Lifting sling MBL 600Te

Wood and Clark

1996

MBL 800, 400Te

ABB Kraft / Turbines

1997

Hydroelectric Power Installation, MBL 400T

Stolt Comex Seaway

1997

Subsea installation slings, MBL 324Te

Stolt Comex S. /  Ekofisk

1997

Installation Wye structure, MBL 375Te

KOS

1997

Installation Manifolds, MBL 390, 280, 210Te

Stolt / Rockwater

1997

Spool inst. Visund Tie-in, Norfra, N.Valhall

Selmer

1997

Concrete elements, MBL 450Te

Ministry of Defence

1997

Lifting neuclear submarine, MBL 600Te

KOS

1998

Installation of Manifolds, Hubs,, MBL 390Te

Rockwater

1998

Subsea installation, MBL 270Te

Stolt / Maersk

1998

Installation slings MBL 280Te

ABB Nat.Transformers

1998

Transformer lifting, MBL 400, 280Te

Water Weight

1998

Lifting sling MBL 930Te

Rockwater

1999

Installation sling, MBL 650Te

NSB / New trains

1999

Train lifting sling, MBL 160Te

Rockwater/Åsgard bundle

1999

Pull-in sling, MBL 1000 Te, WLL 253Te

ABB Kraft

1999

Lifting Turbines, MBL 385Te

Stolt, Rockwater / Spools

1999

Installation slings

KOS / Terra Nova

1999

Inst. Manifolds, Hubbs,  MBL 390, 210Te

Stolt Comex Seaway

1999

Installation slings MBL 525, 475Te

KOS / Manifolds, Hubbs,,

2000

Installation, MBL 388, 276, 155Te

Selmer / Concrete bridge

2000

Uglen,  MBL 450Te

Stolt C.S. / Pig recovery

2000

MBL 475, 270, 250Te

SCS, Rockwater / Spool

2000

Installation slings

KOS / Girassol

2000

Inst. Manifolds, Hubbs,  MBL 390, 210Te

Coflexip / Kyle Tie Inn