Track records - Seabed Anchors



Project

Customer

Delivery

Design Life

Contract / Product

Eid Parry Project, India

NKT

09-95

10 years

Design and installation engineering of a Suction Plem Foundation

Fergus

Rockwater Ltd

07-96

20 years

EPCI of 1x Suction Riser Base, 52t

Schiehallion

Coflexip Ltd

05-97

25 years

Design, Engineering and manufacturing drawings of two riser base options: Suction-in and Impact Pile.

Åsgard A

Stolt Offshore

08-98

20 years

EPC of 3xUmbilical Anchors 30t w/tethers

Troll C

Stolt Offshore

08-98

30 years

PC of 3xSuction Anchors 54t for preinstalled rig moorings

Troll C

Stolt Offshore

08-99

30 years

PC of 6xSuction Anchors 54t for preinstalled rig moorings

Åsgard B

Stolt Offshore

05-99

20 years

EPC of 3xUmbilical Anchors 30t w/tethers

Åsgard B

BRES/RW

07-99

N/A

EPC of Pull-in Anchoring System for A02 Bundle

Snorre B

Coflexip Norge

02-00

25 years

Design, Engineering and manufacturing drawings of 15x Riser Anchors, 30-80t

Heidrun

 

Halliburton

02-00

20 years

EPC of 2x Hold Back Anchors w/tethers

Mikkel

 

Halliburton

05-02

20 years

EPC of 1x Umbilical Anchor w/tether

Kristin

Technip Offshore Norge

2003-2004

25 years

EPC of 30 x Suction/Gravity Riser Anchors 30-60t, with tethers and ROV suction interface + installation criteria

Norne

Stolt Offshore

2004-2005

25 years

EPC of 2 x Suction/Gravity Riser Anchors 45t with tethers

Visund

Stolt Offshore

2005

25 years

EPC of 2 x Suction/Gravity Riser Anchors 45-60t with tethers

Vøring

ENI Norge AS

2006

NA

EPC of 2 off Well Base for pre-installed conductors

Tyrihans

Technip Offshore Norge

2007

25 years

EPC of 12 x Suction/Gravity Riser Anchors 30-60t, with tethers and ROV suction interface + installation criteria

Moho-Bilondo

Acergy SA

2007

15 years

EPC of 4 x Suction/Gravity Riser Anchors 25t, with tethers


For further inquiries, please contact us by e-mail: post@selantic.com, or by phone: +47 55 92 73 00.

...